Boyes Drive repair work on hold till further notice

Please be advised that the Boyes Drive repair work is on hold until further notice as a result of the country wide bitumen shortage.

The project team is unable to confirm when works will resume as this is solely dependent on the supply of Bitumen. As such, the southbound lane on Boyes Drive is open.

Please note that once works on Boyes Drive resume, a temporary one-way system for northbound traffic between the hours of 09h00 to 16h00 (for the section from Clairvaux Road to Old Boyes Drive) will be reintroduced for the duration of the works.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


%d bloggers like this: