Please be advised that the Contractor will be opening the northbound carriageway on Main Road between Hillrise and Sandhurst Roads tomorrow, Wednesday, 19th October 2011 (Phase 1). Thus, Main Road will be open to two-way traffic from Muizenberg to Hillrise Road, St James.
However, the Contractor still needs to undertake inspections and minor repairs to individual manholes during which, a localised stop/go system will be put in place in the vicinity of the particular manhole.
Boyes Drive Update:
Please note that repairs on Boyes Drive is on-going but is dependent on bitumen availability and dry weather. Please be reminded, a one-way traffic system will be put in place for northbound traffic and southbound traffic will be directed to use Main Road between 09h00 and 16h00 on the days that repair work is being undertaken.